Ship and record
A green light ends the judging, not the ticket. Shipping is the pull request, the merge, and what the ticket leaves behind: a record the next issue starts from.
The pull request body
Section titled “The pull request body”/pr shapes the body in three sections: “a Summary that shows the change, Evidence that it works, and a Merge Danger call on how risky it is to land” (source: Matt Pocock: pr). “The summary is a visual, not a paragraph” (source: Matt Pocock: pr): it “picks the smallest view that makes the key point clear” (source: Matt Pocock: pr), pseudocode, a call tree, a component tree, a file tree, a diagram or a shaped diff. The evidence is a before and an after; “a screenshot is the strongest evidence when the change is visual” (source: Matt Pocock: pr), otherwise the exact test that failed and now passes. The merge danger names “whether the change is a one-way door or a two-way door, and its blast radius” (source: Matt Pocock: pr): “a two-way door is cheap to reverse” (source: Matt Pocock: pr), and a one-way door is read slowly. My pull requests stay small, and they carry the manual test steps and what was left out on purpose.
The merge
Section titled “The merge”Before this run, every merge of this site waited for my green light. The batch is bounded by the third rule: never more work in flight than I can review the same day. For the run that wrote these docs I made one exception, on purpose: the agent creates and merges each pull request once mattpocock-skills:code-review and CI pass, and I test the finished site before launch. The journal quotes that request. Either way nothing merges on a red check: CI runs the gates on every pull request, and again on main.
The preview
Section titled “The preview”The host builds a preview of every pull request, listed among its checks, and the production site from main. The first pull request of this site passed the type check, the build, the browser tests, the confidentiality job and the preview build before I merged it, and the production build went live on the merge. The site stays noindex until launch.
The journal entry
Section titled “The journal entry”Every ticket ends with an entry in the journal, in five parts: the header with the issue, the step, the size and the model; what happened; the decisions, including the ones made for me while I was away; the evidence, with the gate outputs and their numbers; and the prompts, quoted verbatim with their translation. The entry is written for a reader who was not there: which tests were red first, what the review caught, what was kept on purpose. A name from the confidentiality list is replaced with [redacted]. Once written, an entry is not rewritten when the site changes.
The retro that changes the environment
Section titled “The retro that changes the environment”After the merge, /retro, “in the session it’s looking back on, before you clear” (source: Matt Pocock: the ask-matt skill file). “It changes the environment, not the code” (source: Matt Pocock: retro): it reads the session’s record, “finds the moments where the agent struggled” (source: Matt Pocock: retro), and “proposes the check, pointer, or standard that prevents them next time” (source: Matt Pocock: retro). “It also only proposes. Nothing changes until you pick a candidate.” (source: Matt Pocock: retro) The rule it applies is the fifth of mine, a mistake that repeats becomes a check: a mechanical violation “gets a deterministic check, because a check can fail and a sentence in a standards file can’t” (source: Matt Pocock: retro), and “only real judgement calls, which no linter can enforce, become prose” (source: Matt Pocock: retro). On this site the sweep of every built page for the old words is that kind of check: the spec asked for it so that an old word never ships again, and it fails the build where a line in CLAUDE.md could only advise.
Building in public
Section titled “Building in public”These docs are built in public, with a delay. The journal goes public at launch, and so do the links to the repository; until then no page links to either, because a private repository answers a reader with a 404. A browser test reads every built page and fails on a link to the repository, so the delay holds without anyone remembering it.
The routine
Section titled “The routine”- When
- The verdict is a green light.
- What you type
/prfor the body; once the pull request has merged,/retroin the session that built the ticket, before you clear it.- What it produces
- A pull request with its smallest visual, its before and after, its door and blast radius, and the manual test steps; a journal entry in five parts; retro candidates, of which you pick one or none.
- What proves it
- CI is green on the pull request and on
main; the preview, then production, serve the change; the journal entry holds the gate numbers and the prompts verbatim; a picked candidate exists as a check or a standard, not as a line of memory.